The most common first call we get

Before you change contractor, get your records out of the old one

Changing is usually straightforward and often overdue. But there is a sequence to it, and there is one thing that can cost you thousands if nobody raises it — which almost nobody does, because raising it can cost them the job.

Two things worth knowing first

The records are yours, and the new firm should not quote before it has read them

Your equipment list, service history, readings and warranty registrations describe your building, not your contractor’s business. Ask for them. Most firms hand them over without any fuss, and a firm that refuses has told you something useful about the last few years.

And a new contractor who produces a replacement price before they have found every unit and read every rating plate is guessing on your behalf. A first visit to a building nobody has documented is a survey, not a quotation. If it is being sold to you as a free estimate that ends in a number, the number came from somewhere other than your building.

Work it through

Why you are changing, and what you already have

Nothing is sent anywhere and nothing is recorded. This is what we would ask you on the telephone.

Stop here and read the warranty before you sign anything with anybody, including us

Manufacturers’ warranties on heating and cooling equipment commonly carry conditions, and two of them matter enormously when you change contractor. The first is registration: many warranties are only at their full length if the unit was registered within a window after installation, and the registration usually names an installing dealer. The second is maintenance: a good many warranties require documented annual maintenance, and a claim can be refused if nobody can produce the records.

Some manufacturers go further and restrict parts coverage to units installed or serviced by one of their authorised dealers. If yours does, and your new contractor is not one, you can lose thousands of dollars of cover by switching — and you will not find out until something fails.

What to do, in this order: find the warranty certificate and the registration confirmation; read what it says about maintenance records and about who may service the unit; telephone the manufacturer, not the contractor, and ask directly whether changing servicer affects your cover; and get the answer in writing before you move.

And about us, plainly: we are not an authorised dealer for every brand. If your equipment is inside a warranty that requires one and we are not it, we will tell you so, and we will tell you not to use us for that unit until the warranty runs out. We would rather lose the work than cost you the cover.

What we would do

Ask for the records first, and change while you are calm rather than mid-failure

Write, do not telephone, and ask for the equipment list, the service history, the last set of readings, the filter sizes and any warranty registrations. Writing gives you a record of the request. Most firms send it. If yours does not, you have lost nothing but a week and you now know to allow for a full survey with the new contractor.

Then change in a quiet month rather than in the middle of an August failure. The first visit from anyone new is a survey, and a survey done under pressure is a worse survey. If something is already broken, get it fixed by whoever can attend, and do the changeover afterwards.

One thing worth doing before you go: write down, specifically, what went wrong. “They were unreliable” is not a brief. “Three visits for the same fault, no written readings, and nobody could tell us how old the unit was” is, and it tells the next firm exactly what to prove.

About being let down

Ask the new firm what happens when a fault recurs after their visit, and get the answer before you appoint them rather than after. It is the single most useful question on the list and hardly anybody asks it.

With no paperwork at all

This is the normal situation and it is entirely workable. Serial numbers give manufacture dates, a survey gives condition, and city permit records often give installation dates. Budget for one longer first visit and you are back in control. Do not let anybody quote a replacement before that visit has happened.

In every case

Ask the incoming firm these four questions

What does your first visit produce?
If the answer is a quotation rather than a record, you are being sold to rather than surveyed. A first visit to an undocumented building should produce an inventory and a set of readings.
What exactly gets measured at a maintenance visit?
As a list. Static pressure, airflow, charge against the manufacturer’s target, temperature split, amp draw, combustion where there is gas. Without that list, two prices cannot be compared.
Do I get the records, and in what form?
They describe your building. You should leave every visit holding them, and you should be able to take them to another contractor without asking permission.
Are you an authorised servicer for my equipment?
Ask it directly, brand by brand, and ask what happens to your warranty if the answer is no. A firm that answers this straight is worth more than one that is cheaper.